Jiangxi water conservancy and Hydropower Construction Co., Ltd.

News

News

Location:Home > News

Wuhu Jingfang Pumping Station passed the acceptance test

Author: release time: 2018-12-22 browsing number: 0

On December 18, the civil construction and equipment installation unit of Jingfang Pumping Station in Wuhu City, which was undertaken by our company, passed the acceptance test smoothly.

The acceptance meeting was presided over by the Construction Office of Jingfang large-scale drainage pumping station in Wuhu City, which is  project legal person. The participating units include design, supervision, construction and operation management teams. The leaders of the Municipal Water Affairs Bureau, the quality supervision department of water conservancy projects in Wuhu City and the safety supervision department of the Municipal Water Affairs Bureau also attend the acceptance meeting. Nearly twenty delegates attending the meeting visited the site after the completion of the pumping station and gave a high evaluation.

Jingfang Pumping Station in Wuhu is a large (Catagory 2) pumping station, and its engineering grade is grade II. It is one of the key projects for the adjustment of flood control and waterlogging control system in urbanization development of the middle water network area of Wuhu City.



Copyright statement| Site map| Add collection| Background management

Jiangxi water and Hydropower Construction Group Co., Ltd.
No.32, Block C, Fushengxi Road, Qianyi Construction Science and Technology Industrial Park,Jiangxi,China Postal Code: 330200
Jiangxi water and Hydropower Construction Group Co., Ltd. All rights reserved 2009-2021 赣ICP备18002566号-3
Technical support: Nanchang network company  Mount Everest Technology